国产手机在线αⅴ片无码观看-麻豆国产精品久久人妻-国产欧美日韩综合精品一区二区-欧美一性一乱一交一视频

行業(yè)產(chǎn)品

  • 行業(yè)產(chǎn)品

常州竹簀閥門有限公司


當(dāng)前位置:常州竹簀閥門有限公司>>電動(dòng)閥門>>電動(dòng)二通閥>>動(dòng)態(tài)平衡電動(dòng)二通閥/電動(dòng)平衡調(diào)節(jié)閥/電動(dòng)平衡閥

動(dòng)態(tài)平衡電動(dòng)二通閥/電動(dòng)平衡調(diào)節(jié)閥/電動(dòng)平衡閥

返回列表頁
參  考  價(jià)面議
具體成交價(jià)以合同協(xié)議為準(zhǔn)

產(chǎn)品型號VPF

品       牌

廠商性質(zhì)經(jīng)銷商

所  在  地常州市

聯(lián)系方式:葉明花查看聯(lián)系方式

更新時(shí)間:2016-05-16 14:47:57瀏覽次數(shù):345次

聯(lián)系我時(shí),請告知來自 泵閥商務(wù)網(wǎng)

產(chǎn)品簡介

動(dòng)態(tài)平衡電動(dòng)二通閥/電動(dòng)平衡調(diào)節(jié)閥/電動(dòng)平衡閥關(guān)斷力6.8Bar寬壓差范圍內(nèi)盤管水流量精度自動(dòng)恒定模數(shù)化流量工廠標(biāo)定,無需現(xiàn)場平衡調(diào)試。電動(dòng)執(zhí)行器低噪運(yùn)轉(zhuǎn),安裝及拆卸十分方便電動(dòng)執(zhí)行器僅在動(dòng)作時(shí)間15秒內(nèi)耗電4VA,在全開或全關(guān)位置時(shí)機(jī)械鎖定真正零耗電一體化動(dòng)態(tài)平衡電動(dòng)二通閥明顯降低水系統(tǒng)流動(dòng)噪聲,*解決水力平衡問題,綜合節(jié)能效果6%-35%。

詳細(xì)介紹

 

 

動(dòng)態(tài)平衡電動(dòng)二通閥安裝說明

. 安裝前請仔細(xì)閱讀產(chǎn)品說明書,核對產(chǎn)品型號。

. 水流方向必須按照閥體上指示得方向相同。

3. 在用于風(fēng)盤或空氣處理機(jī)組管路時(shí),閥體須位于接水盤上方,以保證出現(xiàn)滴水時(shí)落 入接水盤中。

4. 閥體及執(zhí)行器安裝于垂直方向±60范圍內(nèi),其上方應(yīng)至少有30mm空間用于拆裝。 與周圍管道、設(shè)備、建筑物必須保持足夠的維修操作空間,必須安裝在維修人員通 過檢修孔能觸及到的地方。

5. 閥體安裝完畢并與管路通過試壓后才可安裝執(zhí)行器。閥前需裝過濾器。

6. 所有接線需遵守國家和地方電氣規(guī)范,執(zhí)行器須避免受潮。

Instructions

. Read the instructions carefully, check the product model before installation.

. Flow direction must be identical with the direction on the valve body.

3. When used on a pipeline of fan coil or air handling units, valves shall be located above the water tray to ensure the possible drop fall into the tray.

4. The valve and actuator are recommended to be mounted within ±60 degrees of

the upright position. Above it there should be at least 30mm space for assembly and disassembly. The valve and actuator must be installed with suf?cient operating space around pipelines, equipment and buildings, and where maintenance worker can touch through the access hole.

5. The actuator can only be installed after the valve installed and pressure tested. Strainer is required before the valve.

6. All wiring must comply with local, regional, and national electrical code requirements. The actuator housing must be protected from moisture.

安裝方向/Installation direction

Instructions

. Read the instructions carefully, check the product model

before installation.

. Flow direction must be identical with the direction on the valve body.

3. When used on a pipeline of fan coil or air handling units, valves shall be located above the water tray to ensure the possible drop fall into the tray.

4. The valve and actuator are recommended to be mounted within ±60 degrees of

the upright position. Above it there should be at least 30mm space for assembly and disassembly. The valve and actuator must be installed with suf?cient operating space around pipelines, equipment and buildings, and where maintenance worker can touch through the access hole.

5. The actuator can only be installed after the valve installed and pressure tested. Strainer is required before the valve.

6. All wiring must comply with local, regional, and national electrical code requirements. The actuator housing must be protected from moisture.


感興趣的產(chǎn)品PRODUCTS YOU ARE INTERESTED IN

泵閥商務(wù)網(wǎng) 設(shè)計(jì)制作,未經(jīng)允許翻錄必究 .? ? ? Copyright(C)?2021 http://kids-tokei.com.cn,All rights reserved.

以上信息由企業(yè)自行提供,信息內(nèi)容的真實(shí)性、準(zhǔn)確性和合法性由相關(guān)企業(yè)負(fù)責(zé),泵閥商務(wù)網(wǎng)對此不承擔(dān)任何保證責(zé)任。 溫馨提示:為規(guī)避購買風(fēng)險(xiǎn),建議您在購買產(chǎn)品前務(wù)必確認(rèn)供應(yīng)商資質(zhì)及產(chǎn)品質(zhì)量。

會(huì)員登錄

×

請輸入賬號

請輸入密碼

=

請輸驗(yàn)證碼

收藏該商鋪

登錄 后再收藏

提示

您的留言已提交成功!我們將在第一時(shí)間回復(fù)您~